- 0:00 Commercial down 13%, public up a third
- 0:11 Why a GC who bids both sides watches this
- 0:29 Dodge’s October report
- 0:51 What Dodge counts, and how far ahead
- 1:22 The data center boom mostly wasn’t ours
- 1:44 It’s one month
- 2:05 The public side: up a third
- 2:37 What I do when my side slows down
- 3:12 Bid wider and pickier
- 3:50 Where the public growth really is
- 4:10 Speed wins the bid
- 4:31 Sort last year’s bids into three piles
- 4:55 Private commercial, or public and healthcare?
Dodge Construction Network says commercial projects going into planning dropped 13% in one month. Those are the jobs that’ll be out to bid next. And schools, hospitals and public buildings? Up a third on the year.
I’m a commercial GC in Florida. We do hotels, schools, public agencies, commercial buildings, so I bid both sides of that number, the private work and the public work. If most of what you bid is the office fit-out, the hotel renovation, the warehouse, that’s the side that’s getting thinner. And you’d want to know that a year early, not when the phone stops ringing.
Dodge’s October report
On November 6, Dodge put out its October report. Commercial planning, that’s offices, hotels, warehouses, things like that, was down 13% from September.

Most people will tell you that’s data centers. And data centers did slow down. But take them out, and commercial is still down about 17% from a year ago. That’s a bigger drop than September showed. So it’s not just one kind of building.
What Dodge counts, and how far ahead
What does Dodge actually count? It’s a construction data company, and every month it adds up the dollar value of projects that aren’t houses. Offices, schools, hospitals, warehouses, you name it.
And it counts them as they go into planning, not when they’re going up: projects an owner is just starting to plan. Those turn into drawings, then into a bid set on somebody’s desk, and then into a building. Dodge says this number runs a full year to 18 months ahead of the money actually getting spent. So the bids from these plans land somewhere in between. Not this month. Over the next year or so.
Honestly, the data center boom mostly wasn’t ours to begin with. The contractors’ group ABC, Associated Builders and Contractors, says 39% of contractors doing over a hundred million a year have data center work right now. For the smaller ones, under a hundred million, it’s about one in ten.
So the commercial work most of us actually bid, the office, the hotel, the warehouse, that’s the part that’s slowing.
It’s one month
It’s one month. Dodge’s own head of economic research, Sarah Martin, said some volatility is to be expected. In other words, this number jumps around. October is a first estimate, it gets corrected as more comes in, and Dodge already lowered its September number.
This is a national number too, there’s no Florida cut. So I’m not calling a slowdown. I’m just reading where the plans are going.
The public side: up a third
Now the other side, the public work. The institutional part, that’s schools, hospitals and government buildings, is up 33% on the year. Do that math out loud. For every 3 dollars of that work owners were planning last October, they’re planning about 4 now.
So before you do anything else, look at where last year’s bids actually went. I made a free one page worksheet for it. It sorts twelve months of your bids into private, public and healthcare, so you can see how much you lean on the private side that’s slowing.
I’d rather find that out now than next fall.
When your side slows down, bid wider and pickier
So what do you do when your side slows down? Here’s how I think about it, and part of it I learned the hard way.
Dodge says commercial planning fell 13%, and most small GCs will sharpen the pencil and give away margin. That’s one month of October numbers. Private work slowed, and the public side, schools, hospitals and government buildings, grew by a third over the year. And look, I get the instinct. I’ve been that GC, with five bids out and needing every single one.
When there are only a few bids out, every single one has to land, and the margin is what gets shaved to win it. We’ve done that too many times, unfortunately, and it was a hard lesson to learn.
What I’d do instead is bid wider, and get pickier, at the same time.
- Wider means more of your bids go into the work that’s growing.
- Pickier means no single job is make or break anymore, so the ones that don’t pay are easy to walk away from.
With a lot of bids out, losing one costs you almost nothing.
That sounds backwards, right? But it’s how it works for us. We bid five to ten times the jobs we used to. Some people hear that and think we’re desperate. It’s actually the opposite. Bid five, and every one of them matters. Bid fifteen, and we can lose twelve and be fine, and keep the margin.
Bidding more didn’t make us cheaper. It made us pickier.
The volume is what let us say no and feel good about it.
Where the public growth really is
The thing is, a lot of that growth is big hospital campuses. The biggest one Dodge named in October is a medical campus in California worth over 300 million dollars. Nobody’s handing a small GC that whole job.
So don’t read that public growth as a promise of work. Read it as where owners are putting their planning money, and look for the pieces of it that fit your size.
Speed wins the bid
Those bids aren’t a quick look. The plan sets are big, the line items go on and on, and there’s a hard due date.
And I’m the GC on the other end of a lot of bids from the trades. The first ones that come in get read the hardest. Those big packages take days to price, so the slow ones fall behind. You’re not losing jobs on price. You’re losing jobs because you took a week to send a bid.
Sort last year’s bids into three piles
So I’d start next week. Pull every bid you sent in the last twelve months, and sort them into three piles:
- Private commercial, like offices and stores.
- Public, like schools and government buildings.
- Healthcare.

Then count how many you won in each pile. If most of your bids sit in the pile that’s slowing, start moving a few of next year’s bids toward the one that’s growing.
That’s exactly what the worksheet does, and it’s free.
The bids we’ll all be pricing in 2027 are being planned right now, and nobody knows yet what the November number will say. So I’m keeping an eye on both sides of my desk. Where do most of your bids go today, private commercial, or public and healthcare?
Questions people ask
What does Dodge’s October report say about commercial planning?
Commercial planning, that’s offices, hotels, warehouses, things like that, was down 13% from September. Take data centers out, and commercial is still down about 17% from a year ago.
How far ahead does the Dodge planning number run?
Dodge says this number runs a full year to 18 months ahead of the money actually getting spent. So the bids from these plans land somewhere in between, over the next year or so.
Is the public side of construction growing?
The institutional part, that’s schools, hospitals and government buildings, is up 33% on the year. For every 3 dollars of that work owners were planning last October, they’re planning about 4 now.
What should a small GC do when private work slows down?
Bid wider, and get pickier, at the same time. Wider means more of your bids go into the work that’s growing. Pickier means no single job is make or break anymore, so the ones that don’t pay are easy to walk away from.
Why do contractors lose bids besides price?
The first ones that come in get read the hardest. You’re not losing jobs on price. You’re losing jobs because you took a week to send a bid.
How do I see which side of the market my bids depend on?
Pull every bid you sent in the last twelve months, and sort them into three piles: private commercial, public and healthcare. Then count how many you won in each pile.
Sources
Your next step
01
This template · free
The Bid Pipeline Worksheet
One page that sorts twelve months of your bids into private, public and healthcare, so you can see how much you lean on the side that’s slowing, and where to move a few of next year’s bids.
Your first movePull every bid you sent in the last twelve months and count how many went to private commercial, public and healthcare work.
02
Paul’s Library · free
Get free access to Paul’s whole library
One email opens every checklist and template from Paul’s videos, right here on the site. New ones come by email as he adds them.
- Sub Coverage Checklist
- Desk Jobs Checklist
- First Ten Questions Checklist
- Backlog Worksheet
- ChatGPT Page Claim Checklist
- Before-It-Goes-Down Checklist
- AI Meeting Checklist
- Before-It-Ships Checklist
- Claude Bank Account Checklist
- Bid Pipeline Worksheet
- Weekly Owner Report Template
- Empty Seat Checklist
- ChatGPT Short List Checklist
- Vendor Number Checklist
- Paper Job Worksheet
- Take-Back Checklist
- AI Payback Worksheet
- AI Agent Job Card
- Rent-or-Own Agent Checklist
- Automate-Last Worksheet
- AI Takeoff Checklist
03
Work with Paul
Work with Paul
Through Skoper Labs, I start where you spend the most time, then build AI tools around how your company actually works. You own them, and nothing gets bent around a platform that doesn’t fit.