198,000 Construction Workers Quit in September. Fix the Job Before You Post It

About 198,000 construction workers quit in September. Before you hire for the gap, go through that job one step at a time.

Paul Maloney
Founder & CEO of Maloney Construction, Skoper and Skoper Labs
November 12, 2026
Watch the video, or read the article below.
4:48

The Bureau of Labor Statistics counted about 198,000 construction workers who quit their jobs in September. That’s the most in any month since May of 2023. And if two of those were yours, you already know how that feels. Every empty seat is a job running late, a bid you never got out, and you back in the field at six in the morning covering for them.

What the JOLTS report says

That’s from a monthly government survey of employers, called JOLTS. Employers tell them how many people they hired, how many quit, and how many jobs they still can’t fill. It’s early data, it came out on November 3.

In construction, that’s about one out of every forty workers quitting in a single month. There were still 298,000 construction jobs open at the end of September. So the person you’d want to hire has other places to go too. The report doesn’t say why they left, only that they did.

Don’t post the job yet

I’m a commercial GC in Florida. So say two of your guys just walked. The first thing most owners do is post the job and hire for the gap. If that’s you, I’d say don’t. At least not yet.

Here’s why. Whoever you hire walks into the exact same job the last guy walked out of. Same extra steps, same reports nobody reads, same mess. And a new person can’t tell which of those steps matter, so they’ll do every one of them, because that’s what they were shown.

I’m not talking about cutting people. You can’t delete a framer, somebody still has to hang the walls. But every seat in your company has a week of work that goes with it, and that’s where I’d start.

Write down the seat’s week, line by line

Before I hire anybody, I go through that job one step at a time. Write down everything that person did in a normal week, every report, every trip, every form. Then for every line, ask yourself, does this need to exist?

  • Who actually reads this report?
  • What happens if we just stop doing it for two weeks?
  • Are we doing the same thing twice, once on paper and once in the computer?

And if nobody can tell you why a line is there, cross it out.

The site visit we deleted

Here’s a real one from my company. We used to do a three-⁠⁠hour site visit on every single bid, every job we priced to try and win. Every one. Then we asked, does every bid really need that? Ours didn’t. So we deleted it.

We also stopped bidding the jobs we almost never won. Between those two, my estimator, the guy who prices every job for us, got back at least a day a week.

Do that math out loud. A day a week is about fifty days a year, out of the roughly 250 days a person works. That’s a fifth of an estimator you didn’t have to go find.

Diagram from the video: a grid of workdays in a year with about fifty of them shaded green, labeled about 50 days a year
2:05 in the video A day a week is about fifty days a year, out of the roughly two hundred and fifty days a person works.

I put the questions I ask about every line on a one-⁠⁠page checklist, so you can go through a job before you post it. It’s free.

Because honestly, the cheapest job to fill is the one you deleted.

Musk’s order: automation is step five

Deleting is only the first step. There’s a whole order to it, and most GCs get it backwards.

Before you replace even one of the workers who quit, I’d use Elon Musk’s rule for building rockets. A lot of contractors like me are about to put up a job ad. Don’t, yet. Fix the job first.

I’m stealing this straight from him. Before you automate anything, you do four things:

  1. Question every step.
  2. Delete what doesn’t need to exist.
  3. Simplify what’s left.
  4. Speed it up.

Automation comes last. It’s step five, not step one. But most GCs I know start at the end, and for them the end is hiring.

Simplify, then speed it up

Say the seat is your estimator, the person who prices the work, and you’ve already deleted the steps nobody could tell you a reason for. Next is simplify. That means you make what’s left the same every time. For us, that’s the estimate itself. One format, three sheets, every single time. That way nothing gets built from scratch, and anybody who sits in that seat knows exactly what done looks like.

Third is speed it up. That means you find where the time sits waiting around. For us, it wasn’t the estimate. Sometimes we spent more time chasing our subs, the trade companies we hire, for their numbers than actually putting the estimate together. So that’s where you push, before anything else. The waiting is usually where the days go, not the work.

Diagram from the video: the estimator's card, with the estimate in one format of three sheets and a long bar for chasing sub numbers
3:35 in the video Sometimes we spent more time chasing our subs, the trade companies we hire, for their numbers than actually putting the estimate together.

Then hire into a clean job

Then, and only then, step five: you hire or you bring in tools. And now you’re hiring into a clean job. A short list of real work, with tools that help the person in that seat, not the mess the last guy left behind. And whatever the tools do, some human should put an eye on it, always.

Here’s what happens if you flip the order. If I’d automated first, I would’ve automated a process that was bidding the wrong jobs, the ones we almost never won, with a super bloated workflow. I’d just be doing the wrong things faster. Hire first, and you’re paying somebody new to do the steps you should’ve cut.

And the timing matters. The contractors’ group ABC says more than one in four contractors expect their margins to shrink over the next six months. Labor goes up, your price doesn’t, and your margin takes the hit. So that’s a bad time to pay anybody to carry steps nobody needs.

I put all five steps on one page, the same checklist I run before I fill any seat. It costs nothing.

So say two of your guys quit on Monday, the work is already piling up, and your phone won’t stop ringing. There’s really one choice to make before anything else. Do you post the job, or do you fix the job first?

Questions people ask

How many construction workers quit in September?

The Bureau of Labor Statistics counted about 198,000 construction workers who quit their jobs in September. That’s the most in any month since May of 2023.

What is the JOLTS report?

That’s a monthly government survey of employers. Employers tell them how many people they hired, how many quit, and how many jobs they still can’t fill.

Should I post the job as soon as someone quits?

I’d say don’t. At least not yet. Whoever you hire walks into the exact same job the last guy walked out of, so fix the job first.

What questions should I ask about each task before I hire?

For every line, ask yourself, does this need to exist? Who actually reads this report? What happens if we just stop doing it for two weeks? And if nobody can tell you why a line is there, cross it out.

What is Elon Musk’s rule for building rockets?

Before you automate anything, you do four things. Question every step, delete what doesn’t need to exist, simplify what’s left, and speed it up. Automation comes last. It’s step five, not step one.

What happens if you automate or hire first?

I’d just be doing the wrong things faster. Hire first, and you’re paying somebody new to do the steps you should’ve cut.

Sources

  1. Bureau of Labor Statistics: JOLTS construction series (quits, openings, quit rate)
  2. ABC: Construction Quits Surge to 198,000 in September as Labor Shortages Reemerge
  3. Construction Dive: Nearly 200K construction workers quit in September, the most in over 3 years

Your next step

01

This checklist · free

The Empty Seat Checklist

The questions I ask about every line of a seat’s week, so you can go through a job before you post it and hire into a clean seat.

Your first moveBefore you post the job, write down everything that seat did in a normal week, then ask of every line: does this need to exist?

02

Paul’s Library · free

Get free access to Paul’s whole library

One email opens every checklist and template from Paul’s videos, right here on the site. New ones come by email as he adds them.

  • Sub Coverage Checklist
  • Desk Jobs Checklist
  • First Ten Questions Checklist
  • Backlog Worksheet
  • ChatGPT Page Claim Checklist
  • Before-It-Goes-Down Checklist
  • AI Meeting Checklist
  • Before-⁠⁠⁠It-⁠⁠⁠Ships Checklist
  • Claude Bank Account Checklist
  • Bid Pipeline Worksheet
  • Weekly Owner Report Template
  • Empty Seat Checklist
  • ChatGPT Short List Checklist
  • Vendor Number Checklist
  • Paper Job Worksheet
  • Take-⁠⁠⁠Back Checklist
  • AI Payback Worksheet
  • AI Agent Job Card
  • Rent-⁠⁠⁠or-⁠⁠⁠Own Agent Checklist
  • Automate-⁠⁠⁠Last Worksheet
  • AI Takeoff Checklist

03

Work with Paul

Work with Paul

Through Skoper Labs, I start where you spend the most time, then build AI tools around how your company actually works. You own them, and nothing gets bent around a platform that doesn’t fit.

Free, by email

Follow by email: Paul's new resources

An email when Paul adds a new resource to the library.

You confirm on Paul's Library.
Your email stays with Paul and the team that runs this library. Never sold.
Thanks
Share this article
Paul Maloney
Written by

Paul Maloney

Founder & CEO of Maloney Construction, Skoper and Skoper Labs

I'm a third-⁠⁠generation builder and the founder and CEO of Maloney Construction, a commercial general contractor in Florida. My estimator and I ran hundreds, then thousands, of estimates until a set of plans could go in and a full estimate come out in minutes. That became Skoper, which other contractors now pay for. Every resource here is built from my videos and fact-⁠⁠checked.

About Paul
Keep watching

More from Paul

All videos
Video thumbnail: Florida Says a Miami Company Paid $9,300 for Comp That Should Have Cost Almost $110,000. Not a Better Price, a Missing Cost
Nov 23

Florida Says a Miami Company Paid $9,300 for Comp That Should Have Cost Almost $110,000. Not a Better Price, a Missing Cost

Florida says a Miami construction company paid $9,300 for a year of workers' comp it should have paid almost $110,000 for. Here's what I'd check on a sub.

Video thumbnail: A 153-Year-Old Builder Just Bet $150 Million on Robots
Nov 22

A 153-⁠⁠⁠Year-⁠⁠⁠Old Builder Just Bet $150 Million on Robots

Taisei is putting $150 million into AI and robots. In my company, AI didn't show up on the job site. It showed up at my desk.

Video thumbnail: Anthropic's New Claude Scared Contractors. Most Are Asking It About Dinner
Nov 21

Anthropic’s New Claude Scared Contractors. Most Are Asking It About Dinner

Anthropic's new Claude read a set of construction drawings and built a 3D model of a house. Most contractors only ask it what to cook for dinner.