The AI Takeoff Checklist
Three checks to run on any AI count before it goes in a bid, with only the plans, and how much checking each set of plans needs.
A takeoff is the count and the measurements off a set of plans: every toilet, every wall, every balcony. It's the shopping list. The estimate is what it all costs. On October 6, 2026, a test of 33 takeoff jobs on real building plans came out, and the best of the newest AI models from OpenAI and Anthropic, the companies behind ChatGPT and Claude, scored 34 out of 100. The test was built and graded by a company that sells its own construction AI, and nobody else has checked it yet, though it put the tasks and drawings out for anyone to see.
One page shows the problem. It's one floor of a tower with 15 balconies. OpenAI's best model found all 15. Claude's best found 5, then drew 9 more that aren't on the plan. Both answered the same way, with no warning. You can't tell from the answer alone which one is right.
AI will always make mistakes. Learn which ones it's likely to make, and how to check for them yourself.Put the wrong count in a bid and you're pricing work that isn't there, or you lose the job. So run these three checks on any AI count before it goes in a bid. All you need is the plans.
Don't start at line one. Start where a miss hurts the most: the line items where the most money goes, like concrete, drywall and electrical. A line item is one row of the estimate: one material or one scope of work, with its quantity and its price.
1. [LINE] AI count: [QTY + UNIT]
2. [LINE] AI count: [QTY + UNIT]
3. [LINE] AI count: [QTY + UNIT]
Make the AI show you where each count came from: which sheet, which page, marked right on the plan. A sheet is one drawing in the plan set, numbered in its title block (A-101 for a floor plan, for example).
Pick one sheet and count it by hand, then compare. Just one sheet, not the whole set.
The balcony rule. On the test's balcony sheet, the model that missed 10 of the 15 also drew 9 that don't exist. Missing and adding are two different mistakes, so look for both.
In my experience, a good AI takeoff is about 90% right on a clean, readable set of plans. So I assume any count could be 10% high or 10% low, and I review all the major categories. For example, if the AI counts 2,640 square feet of drywall, the real number could be anywhere from about 2,376 to 2,904.
The counting's done before you sit down. Your time goes to the judgment: the prices, the labor, the schedule. That's the part you get paid for.
Sources
Keep reading free with your library card
One email opens this checklist and all 21 resources in Paul's library. No account, no password.
On your next AI count, write down your three biggest dollar lines and check those before anything else.
Saving works best in your phone's browser. A copy is also in your inbox.