Paul MaloneyChecklist · 4 min read

The Empty Seat Checklist

The questions I ask about every line of a seat's week, so you can go through a job before you post it and hire into a clean seat.

01 Before you post the job

The Bureau of Labor Statistics counted about 198,000 construction workers who quit in September 2026, the most in any month since May 2023. If two of them were yours, the first thing most owners do is post the job and hire for the gap. I'd say don't. At least not yet.

Here's why. Whoever you hire walks into the exact same job the last guy walked out of. Same extra steps, same reports nobody reads. And a new person can't tell which steps matter, so they'll do every one of them, because that's what they were shown.

I'm not talking about cutting people. You can't delete a framer, somebody still has to hang the walls. But every seat in your company has a week of work that goes with it. That week is what this checklist goes through, one line at a time, before you post anything.

The cheapest job to fill is the one you deleted.
02 Write down the seat's week

Pick the seat you're about to fill. Write down everything that person did in a normal week: every report, every trip, every form. Not the job description. What they actually did. One line per task.

The seat's week
Seat: ____________

Reports they made:
1. ____________ Who reads it? ____________
2. ____________ Who reads it? ____________

Trips they took:
1. ____________ Why? ____________
2. ____________ Why? ____________

Forms they filled in:
1. ____________ Also in the computer? Yes / No
2. ____________ Also in the computer? Yes / No

Keep it plain. One task per line, so every line can get its own answer in the next step.

03 The questions for every line

Now take each line and run it through these. If nobody can tell you why a line is there, cross it out.

Does this need to exist? Ask it first, before you ask how to do it faster.
Who actually reads this report? Write down the name of the person who uses it.
What happens if we stop doing it for two weeks? Picture the job without it for two weeks.
Are we doing the same thing twice? Once on paper and once in the computer is one too many.
Can anybody say why it's there? If nobody can, cross it out.

What it looked like for us

We used to do a three-hour site visit on every single bid, every job we priced to try and win. Then we asked: does every bid really need that? Ours didn't, so we deleted it. We also stopped bidding the jobs we almost never won. Between those two, my estimator, the guy who prices every job for us, got back at least a day a week.

Do the math out loud. A day a week is about fifty days a year, out of the roughly two hundred and fifty days a person works. That's a fifth of an estimator you didn't have to go find. Run the same math on every line you cross out.

04 Simplify, then find the waiting

Deleting is only the first step. There's an order to the rest, and I'm stealing it straight from Elon Musk's rule for building rockets: automation comes last.

Simplify what's left. Make it the same every time. For us, that's the estimate itself: one format, three sheets, every single time. Nothing gets built from scratch, and anybody who sits in that seat knows exactly what done looks like. Look at your remaining lines and ask: which of these gets done a different way each time?

Speed it up. Find where the time sits waiting around. For us, it wasn't the estimate. Sometimes we spent more time chasing our subs, the trade companies we hire, for their numbers than putting the estimate together. So that's where you push first. Next to each line, mark what it waits on.

Where the days go. The waiting is usually where the days go, not the work.

05 Then fill the seat

Then, and only then, you hire or you bring in tools. Now you're hiring into a clean job: a short list of real work, with tools that help the person in that seat, not the mess the last guy left behind. And whatever the tools do, some human should put an eye on it, always.

If you flip the order. Automate first and you're doing the wrong things faster. Hire first and you're paying somebody new to do the steps you should've cut.

The timing matters too. ABC, the contractors' group, says more than one in four contractors expect their margins to shrink over the next six months. That's a bad time to pay anybody to carry steps nobody needs.

I wrote down the seat's week. Every report, every trip, every form.
I asked the questions about every line. And crossed out what nobody could explain.
I made what's left the same every time. One format, so nothing is built from scratch.
I found where the time sits waiting. And pushed there first.
Now I post the job. Into a clean job, with a person checking whatever the tools do.

Sources

Paul's LibraryLibrary card
Free access

Keep reading free with your library card

One email opens this checklist and all 21 resources in Paul's library. No account, no password.

It opens right here, and a copy goes to your inbox. You'll also get Paul's new resources. Unsubscribe in one click.

Thanks
You finished it
Now do one thing

Before you post the job, write down everything that seat did in a normal week, then ask of every line: does this need to exist?

Saving works best in your phone's browser. A copy is also in your inbox.